Hamehook Road Bridge Replacement Project

Hamehook Road Bridge Replacement Project

NEWS

There is no current Project News.

Questions and comments regarding the project can be submitted using the “Questions and Comments” feature below. 

PURPOSE AND NEED

The Hamehook Road Bridge is a timber bridge located northeast of Bend that was constructed in 1977. As development and population increase to the north and east of Bend, Hamehook Road continues to be an important north-south route for road users bypassing Bend for access to and from US 97.

The timber structure is experiencing checking and cracking throughout the deck and girders. The existing concrete piers, abutments and footings are delaminating and cracking, and the metal bridge railing is substandard and in need of replacement. The bridge has a sufficiency rating of 73.9 out of 100.

SCOPE OF WORK

The Project scope includes:

  • Removal of the existing structure
  • Realignment of Hamehook Road
  • Construction of a single-span, precast, prestressed concrete slab structure
  • Installation of bridge approach guardrail, signage, and other safety improvements

ESTIMATED COST AND SCHEDULE

The current estimated project cost is $1.8 million.

Anticipated project schedule:

  • Preliminary Engineering:      July 2023 – August 2024
  • Right-of-Way:                         October 2023 - March 2024
  • Construction:                         September 2024 – August 2025

COMMENTS AND QUESTIONS